Development
History
- 2006 - 2008: Concept development
- 2008 - 2009: Validation of concept: Optimization of the concept.
Extensive calculations and analysis performed by WindSea and external specialist companies (RISØ DTU etc.)
Test performed in water tank: The marine performance of the vessel, power production at different sea conditions as well as the ability to self orientating towards the wind.
Test performed in wind tunnel: Power production including the effect of wake and turbulence.
Test performed in water tank with wind exposure (combined water ytank / wind tunnel test)
Results
- The main principal of the WindSea floater has been validated
- The total energy production for a given configuration has been calculated
- The power production of the system has been calculated and verified in test to be 93% of the theoretical maximum, based on comparison to three stand alone turbines
- Wake effect: The results from the test and WindSea`s calculations are in accordance with third party calculations (RISØ)